Tuzla Geothermal Energy Co.

Group company Egenda Ege Energy Production Co. holds a 100% share of Tuzla Geothermal Energy Production Co. Located at Tuzla region in Çanakkale Province, Ayvacık District, Tuzla Geothermal Power Plant has an installed capacity of 7.5 MWe and an annual average production capacity of 56,070 MWh. A 40-year production license was granted in May 2004. Tuzla GPP started operation in January 2010 as a binary cycle geothermal power plant with 2 production wells (at 540 m and 565 m) and 2 re-injection wells (at 927 m and 871 m) with reservoir and wellhead temperatures of 174 C and 148 C respectively. The current 7.5 MWe design is based on 48 ton/h steam and 693 ton/h of superheated water. A new 500 m deep production well with a wellhead temperature of 148 C was phased in on 18.08.2018 allowing the power plant to feed on 3 production wells. Produced energy is sold to EPİAŞ in scope of RESM.

Operational Plants

1- Tuzla GPP

 