Egenda Ege Power Production Co.
14.03.1997
128.145.931 TL/72.390.651 $
210.000.000 TL
127,3 GWh/Year
4455 MWm / 43,50 MWe
Hydroelectric (River Type)
27.12.2007
Adana / Karaisalı
June 2013
Production / 49 Year
Francis (Vertical)/Flovel
3 (8,5 + 2 x 17,50 Mwe)
276 m – 17,4 m3/sec
E-2 Substation 154 kV – 2.6 km
Operating under the legal entity of Egenda, Eğlence-I HPP is located on Eğlence stream in Adana’s Karaisalı District. This is a river type hydro-power plant installed as a cascade system together with Eğlence-II.
The plant was granted a 49-year production license on 27 December 2007. Investment commenced in 2010 together with the Eğlence-II HPP project and commercial operation started on 13 June 2013, following a Ministerial approval.
An application was made to EMRA on 2 October 2017 to increase licensed installed capacity from 43.63 MWm / 42.65 MWe to 44.55 MW/43.50 MWe. The capacity increase application was approved by EMRA on 25 January 2018 according to the Committee Verdict Nr. 7655/7.
Power produced at Eğlence-I HPP is sold in scope of the RESM scheme at a rate of 73 USD / MWh for a 10-year period valid from 2014.