Egenda Ege Power Production Co.
14.03.1997
81.195.756 TL/25.905.193 $
210.000.000 TL
47,3 GWh/Year
16 MWm / 16 MWe
Renewable
Wind
29.05.2008
İzmir / Çeşme
03 June 2016
Production / 49 Year
E82-E2/Enercon
8
II
MV
Egenda’s third wind plant Alaçatı WPP is located at Kızılkayakaradağ- Karadağ Ovacık, Çeşme District, Izmir Province. The facility has an installed capacity of 16 MWe and was granted a 49-year production license by EMRA on 29 May 2008.
The facility entered commercial operation on 3 June 2016 following 6 months of intense preparation work.
An application was made to EMRA on 26 December 2017 to increase licensed installed capacity at Alaçatı WPP from 16 MWe /16 MWm to 24 MWe/24 MWm. The application is still being processed.
For a 10-year period valid from 2017, power produced at Alaçatı WPP will be sold in scope of the RESM scheme at a rate of 85.8 USD/MWh in the first five years and 73 USD / MWh in the following five years.