ALAÇATI WPP / 16 MWe Egenda Ege Energy Production Co.

Partnership Structure

Egenda A.Ş.
%100
President

Cem Bakioğlu

Vice President

Samim Sivri

Member

Murat Demirer

Member

Süleyman Kamil Şenocak

Member

Ahmet Sırrı Yırcalı

Member

Ahmet Metin Tarhan

Member

Koray Kıymaz

Member

Selçuk Borovalı

Member

Hüseyin Metin Tuncay


Company Information

Legal Entity

Egenda Ege Power Production Co.

Founded

14.03.1997

Investment Cost

81.195.756 TL/25.905.193 $

Capital

210.000.000 TL

Annual Production Capacity

47,3 GWh/Year

Installed Capacity

16 MWm / 16 MWe

Facility Type

Renewable

Energy Source

Wind

License Acquired

29.05.2008

Location (Province/District)

İzmir / Çeşme

Commercial Operation

03 June 2016

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

E82-E2/Enercon

Number of Units

8

Wind Category

II

Connection Type

MV

Egenda’s third wind plant Alaçatı WPP is located at Kızılkayakaradağ- Karadağ Ovacık, Çeşme District, Izmir Province. The facility has an installed capacity of 16 MWe and was granted a 49-year production license by EMRA on 29 May 2008.

The facility entered commercial operation on 3 June 2016 following 6 months of intense preparation work.

An application was made to EMRA on 26 December 2017 to increase licensed installed capacity at Alaçatı WPP from 16 MWe /16 MWm to 24 MWe/24 MWm. The application is still being processed.

For a 10-year period valid from 2017, power produced at Alaçatı WPP will be sold in scope of the RESM scheme at a rate of 85.8 USD/MWh in the first five years and 73 USD / MWh in the following five years.