MORDOĞAN WPP / 13,8 MWe Egenda Ege Energy Production Co.

Partnership Structure

Enda
%100
President

Cem Bakioğlu

Vice President

Samim Sivri

Member

Murat Demirer

Member

Süleyman Kamil Şenocak

Member

Ahmet Sırrı Yırcalı

Member

Ahmet Metin Tarhan

Member

Koray Kıymaz

Member

Selçuk Borovalı

Member

Hüseyin Metin Tuncay


Company Information

Legal Entity

Egenda Ege Power Production Co.

Founded

14.03.1997

Investment Cost

63.421.694 TL/20.285.590 $

Capital

210.000.000 TL

Annual Production Capacity

42,95 GWh/Year

Installed Capacity

15 MWm / 13,8 MWe

Facility Type

Renewable

Energy Source

Wind

License Acquired

29.05.2008

Location (Province/District)

İzmir / Karaburun

Commercial Operation

24 June 2016

Operational Model/Duration

Production / 49 Year

Unit Type/Manufacturer

E82-E4/Enercon

Number of Units

5

Wind Category

II

Connection Type

MV

Mordoğan WPP is Egenda’s fourth wind plant. The turbines are located at Çatalkaya Mahallesi- Yellicebelen Hill, Mordoğan District, Izmir Province. The facility has an installed capacity of 13.8 MWe and was granted a 49-year production license by EMRA on 29 May 2008.

The facility entered commercial operation on 24 June 2016 following 7 months of intense preparation work.

An application was made to EMRA on 30 November 2017 to increase licensed installed capacity at Mordoğan WPP from 13.8 MWe /15 MWm to 15 MWe/15 MWm. The application is still being processed.

For a 10-year period valid from 2017, power produced at Mordoğan WPP will be sold in scope of the RESM scheme at a rate of 85.8 USD/MWh in the first five years and 73 USD / MWh in the second five years.